Skip to main content
Site Safety UAE — construction site safety software logoSite Safety UAE
Login
Controlled Checklists

UAE HSE Controlled Checklist Library

48 controlled checklists spanning management systems, welfare, hazardous substances, equipment and plant, high-risk works, environment, community, security and performance — each with 86–93 checkpoints and the standard fields: Status (Yes/No/N/A), Comments, Corrective Action and Sign-off.

Print or download any checklist as a PDF, CSV or Markdown for site use, or open it as a live checklist on a phone or tablet — tick each point, add comments and corrective actions, name who is responsible, set a due date and attach photo evidence. Everything your crews complete appears on the checklist tracker for your organisation.

New · print and go

Printable UAE site checklists — welfare to working at height

29 one-page checklists covering MOHRE, ADOSH-SF, Dubai Municipality, Civil Defence, EAD and Trakhees requirements plus every major site activity.

Open →

New · free tool

UAE Site Electrical Inspection Checklist — 82 points

Earthing and bonding, isolation and LOTO, distribution boards, RCDs, breakers and LCBs, generators, cabling, site offices and welfare — referenced to DoE EWR 2020, ADOSH-SF CoP 15.0, Dubai Building Code 2021, BS 4363, BS EN 61439-4 and IEC 60364.

Open checklist

New · free tool

UAE Working at Height Inspection Checklist — 78 points

Permits and rescue planning, scaffolding and mobile towers, ladders, edge protection and openings, fall arrest and PPE, MEWPs and suspended access — referenced to ADOSH-SF CoP 8.0, the Dubai Municipality Code of Construction Safety Practice and BS EN 12811/131/361/795.

Open checklist

Showing 48 of 48 checklists.

Part G — Equipment & Plant

MEWP safety

Section 65

Owner: HSE Manager / Document Controller

89 checkpoints
Live appOpen
Part I — Environment

Night work

Section 92

Owner: HSE Manager / Document Controller

87 checkpoints
Live appOpen

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.