Medical & First Aid

First aid room requirements, on-site medical clinics for large camps, quarantine facilities, and ambulance access.

First Aid and Medical Facilities

Every labour accommodation must feature a dedicated first-aid room staffed by a qualified nurse, alongside specific quarantine or isolation rooms for workers with infectious conditions. The first-aid room must be equipped with requisite furniture, tools, and a medicine box.

  • Critical
    First-aid room
    Mandatory in all accommodations
  • Critical
    Nurse
    Qualified nurse required
  • Critical
    Quarantine/isolation room
    Mandatory with requisite equipment
  • Standard
    Minimum lighting in first-aid room
    300 lux

Large Accommodation Medical Requirements

For large-scale accommodations housing 1,000 workers or more, operators are required under the 2026 MoHRE guidelines to establish a 24-hour medical clinic staffed by doctors and nurses. Even larger facilities must ensure immediate ambulance access is available on-site or on call.

  • Critical
    Threshold for 24/7 clinic
    1,000 workers or more
  • Critical
    Clinic staffing
    Doctors and nurses, 24/7
  • Critical
    Ambulance access
    Required for very large facilities

The 24-hour clinic requirement is a new mandate introduced in 2026 and represents a significant upgrade from previous standards.

People of Determination and Injured Workers

The 2026 regulations introduce a new requirement for dedicated, accessible facilities tailored for injured or sick workers and People of Determination. These facilities must be appropriately equipped and accessible without barriers.

  • Critical
    Dedicated facilities
    Required for People of Determination and injured workers

Reference material only. Fines and inspection cycles are applied at authority discretion and change often — verify against the current circular for your jurisdiction before relying on any figure.

Next step

Turn this into evidence you can hand over

Know exactly what ADOSH-SF, Trakhees, Dubai Municipality, DCD and MOIAT ask for — and hold the evidence before the inspection.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.