High-risk activities
Excavation, shoring and utility strike prevention
Daily excavation check covering services, support, access, edge loading, water, atmosphere and public protection.
87 checkpoints · Daily while the excavation is open · Dubai Municipality, ADOSH-SF · Updated 8 September 2026
Saved on this device only — sign in to save progress to your account
0 of 87 complete0%
Before breaking ground
Support and stability
Working inside
Protecting others
Temporary works control
Deep excavation and dewatering
Underground services and strike prevention
Excavator and mechanical plant control
Trench and pipe-laying works
Ground conditions and geotechnical monitoring
Confined and low-oxygen conditions in excavations
Environmental protection during excavation
Pipe jacking and tunnelling interfaces
Excavation edge and surcharge management
Backfilling and reinstatement
Excavation records and inspection regime
Excavation permit review and daily sign-off
Public and adjacent property protection
Aligned with the publications named above — not certified by any authority. Always check the current version of the authority publication for your Emirate and free zone.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.