Plant, power & fire
Fire prevention and hot work
Daily hot work and fire prevention check for a construction site, including cylinders, watch periods and escape.
88 checkpoints · Daily where hot work is running · Civil Defence, Dubai Municipality · Updated 8 September 2026
Saved on this device only — sign in to save progress to your account
0 of 88 complete0%
Hot work control
Cylinders and flammables
Site fire readiness
Permit and authorisation
Pre-work area preparation
Fire watch and monitoring
Cutting and welding equipment
Fire detection and suppression readiness
Combustible and flammable material control
Site-wide fire risk management
Post-incident and lessons learned
Portable fire equipment for hot work tasks
Hot work in occupied or phased-handover buildings
Hot work equipment maintenance
Contractor coordination and training
Post-hot-work area handover
Aligned with the publications named above — not certified by any authority. Always check the current version of the authority publication for your Emirate and free zone.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.