Skip to main content
Site Safety UAE — construction site safety software logoSite Safety UAE
Login
All checklists
Plant, power & fire

Fire prevention and hot work

Daily hot work and fire prevention check for a construction site, including cylinders, watch periods and escape.

88 checkpoints · Daily where hot work is running · Civil Defence, Dubai Municipality · Updated 8 September 2026

Saved on this device only — sign in to save progress to your account
0 of 88 complete0%

Hot work control

Cylinders and flammables

Site fire readiness

Permit and authorisation

Pre-work area preparation

Fire watch and monitoring

Cutting and welding equipment

Fire detection and suppression readiness

Combustible and flammable material control

Site-wide fire risk management

Post-incident and lessons learned

Portable fire equipment for hot work tasks

Hot work in occupied or phased-handover buildings

Hot work equipment maintenance

Contractor coordination and training

Post-hot-work area handover

Aligned with the publications named above — not certified by any authority. Always check the current version of the authority publication for your Emirate and free zone.

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.