Skip to main content
Site Safety UAE — construction site safety software logoSite Safety UAE
Login

Emergency Preparedness

Emergency Evacuation Procedures

Types of emergencies, the 4-step evacuation process, Floor Warden and Incident Commander roles, headcount, and re-entry protocol.

v2.0Updated 15 Feb 2026ADOSH-SF v4.1 (February 2026)
6 min
Video
10
Quiz questions
8 / 10
Pass threshold
0%
Your progress

Learning Objectives

  • Identify the types of emergencies requiring evacuation.
  • Follow the 4-step evacuation process.
  • Understand the Floor Warden and Incident Commander roles.
  • Perform a headcount at the assembly point.
  • Follow the re-entry protocol.

Awareness Video

Pro

Preview

6-minute video

Unlock this awareness video

The first 3 modules are free. Upgrade to Pro to watch every module, save progress, and issue certificates.

Upgrade to Pro

Module Content

1. Types of Emergency

Fire, gas leak, structural collapse, chemical spill, bomb threat, medical mass casualty, severe weather (sandstorm, flash flood).

2. Four-Step Process

1. Alarm sounded / raised. 2. Stop work, isolate energy sources if safe. 3. Evacuate via nearest safe route. 4. Muster and account for personnel.

3. Floor Warden

Wears a distinct high-vis vest, sweeps their assigned area, guides people to the exit, is the last to leave, reports to Incident Commander.

4. Incident Commander

Overall control of the emergency, liaises with Civil Defence and Police, decides on re-entry, records the timeline.

5. Headcount

By trade contractor at the assembly point. Missing persons reported to Incident Commander within 5 minutes. Never send a worker back to search — that is the emergency services' job.

6. Re-entry

Only when Incident Commander declares all clear in writing. Debrief within 24 hours. Lessons captured in the emergency plan.

Knowledge Assessment

1. The 4th step of the evacuation process is:

2. The Floor Warden:

3. Headcount at the assembly point is done by:

4. If a worker is missing, you should:

5. Re-entry after evacuation is authorised by:

6. Which is NOT a listed emergency type?

7. A post-incident debrief must occur:

8. The Incident Commander liaises with:

9. Missing persons must be reported to the Incident Commander within:

10. Isolation of energy sources during evacuation is done:

Certificate

Pass the quiz (8 / 10) to unlock your certificate.

Acknowledgement

By signing below, you confirm you have watched the awareness video, understood the material, and will apply these controls on site.

Complete the video and pass the quiz (8 / 10) to unlock signing.

Next step

Turn this into evidence you can hand over

Bilingual awareness modules your supervisors can run in a toolbox talk, with an internal completion record afterwards.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.