Workbook · Part H
H
High-Risk Construction Activities
Progress dashboard
0 of 49 items complete · saved locally to this browser
0%
Complete
0
In progress
0
Blocked
0
Overdue
0
Due ≤14d
0
Document Control
- Reference
- HSE-MAN-H-HIGH-RISK
- Version
- Rev. 0 — Draft for review
- Owner
- Corporate / Project HSE Manager
- Approving authority
- Managing Director / Project Director
- Review frequency
- Annual and after high-risk incident, authority/client change, method change or project scope change
Plans (24)
| # | Title | Owner | Status | Priority |
|---|---|---|---|---|
| 70 | Plan H70 Lifting Safety Program | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 71 | Plan H71 Crane Hoist and Riggin | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 72 | Plan H72 Lifting Sling Configur | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 73 | Plan H73 Work at Height Program | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 74 | Plan H74 Fall Protection and Re | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 75 | Plan H75 Full Body Harness Insp | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 76 | Plan H76 Scaffolding Safety Pro | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 77 | Plan H77 Formwork Falsework and | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 78 | Plan H78 Excavation and Trenchi | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 79 | Plan H79 Underground and Overhe | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 80 | Plan H80 Confined Space Entry P | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 81 | Plan H81 Electrical Safety Prog | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 82 | Plan H82 Lockout Tagout and Iso (ISO 9001 Quality / ISO 14001 Environmental / ISO 45001 OH&S) | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 83 | Plan H83 Welding Cutting and Ho | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 84 | Plan H84 Concrete Pouring Pumpi | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 85 | Plan H85 Rebar Steel Fixing and | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 86 | Plan H86 Masonry Blockwork Plas | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 87 | Plan H87 Waterproofing Coating | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 88 | Plan H88 Demolition Dismantling | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 89 | Plan H89 Roof Works and Fragile | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 90 | Plan H90 Road Works and Work Ad | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 91 | Plan H91 Work Over or Near Wate | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 92 | Plan H92 Night Work and LowVisi | Relevant process owner / HSE lead | Integrated | See plan sheet |
| 93 | Plan H93 Lone Working and Remot | Relevant process owner / HSE lead | Integrated | See plan sheet |
Registers, Matrices & Checklists (25)
- High Risk Permit Matrix
- Lifting Controls
- Crane Rigging Controls
- Sling Selection Matrix
- Work at Height Matrix
- Fall Rescue Readiness
- Harness Inspection Criteria
- Scaffold Control Register
- Temporary Works Controls
- Excavation Controls
- Utility Strike Prevention
- Confined Space Controls
- Electrical Safety Controls
- LOTO Isolation Steps
- Hot Work Controls
- Concrete Pumping Controls
- Steel Rebar Controls
- Finishing Works Controls
- Coating Spray Controls
- Demolition Strip-Out Contro
- Roof Fragile Surface Contro
- Traffic Work Controls
- Water Interface Controls
- Night Work Controls
- Lone Remote Work Controls
Visualisation Dashboard available
This part ships with editable charts and a visual dashboard aggregating its register data.
Item tracker
| Item | Status | Due date | Notes | |
|---|---|---|---|---|
Plan H70 Lifting Safety Program plan | ||||
Plan H71 Crane Hoist and Riggin plan | ||||
Plan H72 Lifting Sling Configur plan | ||||
Plan H73 Work at Height Program plan | ||||
Plan H74 Fall Protection and Re plan | ||||
Plan H75 Full Body Harness Insp plan | ||||
Plan H76 Scaffolding Safety Pro plan | ||||
Plan H77 Formwork Falsework and plan | ||||
Plan H78 Excavation and Trenchi plan | ||||
Plan H79 Underground and Overhe plan | ||||
Plan H80 Confined Space Entry P plan | ||||
Plan H81 Electrical Safety Prog plan | ||||
Plan H82 Lockout Tagout and Iso (ISO 9001 Quality / ISO 14001 Environmental / ISO 45001 OH&S) plan | ||||
Plan H83 Welding Cutting and Ho plan | ||||
Plan H84 Concrete Pouring Pumpi plan | ||||
Plan H85 Rebar Steel Fixing and plan | ||||
Plan H86 Masonry Blockwork Plas plan | ||||
Plan H87 Waterproofing Coating plan | ||||
Plan H88 Demolition Dismantling plan | ||||
Plan H89 Roof Works and Fragile plan | ||||
Plan H90 Road Works and Work Ad plan | ||||
Plan H91 Work Over or Near Wate plan | ||||
Plan H92 Night Work and LowVisi plan | ||||
Plan H93 Lone Working and Remot plan | ||||
High Risk Permit Matrix register | ||||
Lifting Controls register | ||||
Crane Rigging Controls register | ||||
Sling Selection Matrix register | ||||
Work at Height Matrix register | ||||
Fall Rescue Readiness register | ||||
Harness Inspection Criteria register | ||||
Scaffold Control Register register | ||||
Temporary Works Controls register | ||||
Excavation Controls register | ||||
Utility Strike Prevention register | ||||
Confined Space Controls register | ||||
Electrical Safety Controls register | ||||
LOTO Isolation Steps register | ||||
Hot Work Controls register | ||||
Concrete Pumping Controls register | ||||
Steel Rebar Controls register | ||||
Finishing Works Controls register | ||||
Coating Spray Controls register | ||||
Demolition Strip-Out Contro register | ||||
Roof Fragile Surface Contro register | ||||
Traffic Work Controls register | ||||
Water Interface Controls register | ||||
Night Work Controls register | ||||
Lone Remote Work Controls register |