Scaffolding

Design, erection, scafftag inspection regimes, tube-and-fitting and system scaffolds, mobile towers, loading limits and ties — to ADOSH-SF CoP 26.0, DM Code of Construction Safety Practice, BS EN 12811 and BS 5975.

Scaffold Design and Competence

Scaffolds must be erected, altered and dismantled only under the supervision of a competent scaffold supervisor by trained scaffolders. Any scaffold that is not a basic configuration to a recognised standard configuration guide must be designed and calculated by a competent engineer, with drawings on site. Dubai Municipality and Trakhees require third-party-certified scaffolders and inspectors for major projects.

  • Scaffolder competence

    Recognised scaffolding certification (e.g. CISRS or equivalent third-party card)

    critical
  • Scaffold supervisor

    Named, competent, present during erection, alteration and dismantling

    critical
  • Design required when

    Height >8 m free-standing, non-standard configuration, loading >2 kN/m², cantilever, birdcage over voids, sheeted/netted scaffolds

    critical
  • Design documents on site

    Stamped drawings and calculations available for inspection

    critical
  • Standard configuration reference

    BS EN 12811-1 / BS 5975 / TG20-style compliance sheet

    standard

Dimensional and Component Requirements

ElementRequirementReference
Main guardrail height950–1,150 mm above the platformBS EN 12811-1 / ADOSH-SF CoP 26.0
Maximum bay length2.4 m (tube-and-fitting) / 2.5 m (system scaffold)ADOSH-SF CoP 26.0
Maximum lift height2.0 m between platform levelsADOSH-SF CoP 26.0
Intermediate guardrailMax unprotected gap 470 mmBS EN 12811-1
Toe boardMinimum 150 mm high, fitted to all open edgesBS EN 12811-1 / DM Code
Platform width — general accessMinimum 600 mm clear (3 boards)ADOSH-SF CoP 26.0 / BS EN 12811-1
Platform width — with materialsMinimum 900 mm clear (4–5 boards)BS EN 12811-1
Gap between platform and structureMaximum 300 mm, otherwise infill or edge protectionADOSH-SF CoP 26.0
Board overhang at supportsMinimum 50 mm, maximum 4x board thicknessBS 5975
Base plates / sole boardsMandatory on all standards; sole boards on sand or soft groundBS EN 12811-1
Tie spacingPer design; typically every 4 m vertically and horizontally on sheeted scaffoldsBS 5975
Ladder access riseLanding/rest platform at maximum 9 m vertical intervalsADOSH-SF CoP 26.0

Sheeting or debris netting dramatically increases wind load. A scaffold designed unsheeted must never be sheeted without a re-design and additional ties — this is one of the most common collapse causes in the region.

Load Classes

  • Load class displayed

    Stated on the scafftag and design sheet

    critical
  • Loaded bays

    Only bays designed for material storage may be loaded

    critical
  • Simultaneous loaded lifts

    Per design — commonly one loaded lift per bay

    standard
ClassUniform loadTypical use
10.75 kN/m²Inspection and very light access only
21.50 kN/m²Light duty — painting, cleaning, rendering touch-up
32.00 kN/m²General duty — most construction trades
43.00 kN/m²Heavy duty — masonry, blockwork
54.50 kN/m²Very heavy — stone/heavy cladding storage
66.00 kN/m²Special design — engineer calculation mandatory

Scafftag Inspection Regime

Every scaffold must carry a tag at each access point showing its status. A scaffold under erection, alteration or dismantle carries a red 'Do Not Use' tag with the tie/board status; only when a competent inspector has signed it off does it carry a green tag.

  • Inspection before first use

    By a competent inspector, recorded and tagged

    critical
  • Routine inspection interval

    Every 7 days maximum — ADOSH-SF CoP 26.0

    critical
  • Handover certificate

    Scaffold handover certificate issued and signed by the competent scaffold inspector before first use — ADOSH-SF CoP 26.0

    critical
  • Additional inspections

    After alteration, impact, high wind, sandstorm or rain event

    critical
  • Record retention

    Inspection register kept on site for the project duration

    standard
  • Tag content

    Scaffold ID, load class, inspector name, date, next inspection due

    critical
  • Incomplete scaffold

    Red tag and physical access blocked at every ladder/stair

    critical

Mobile Access Towers

Mobile aluminium towers must be assembled strictly to the manufacturer's instruction manual using an advance-guardrail or through-the-trap method, so the erector is never exposed to an unguarded edge.

  • Assembly method

    Advance guardrail (AGR) or 3T through-the-trap only

    critical
  • Height-to-base ratio — indoor

    Maximum 3.5:1

    critical
  • Height-to-base ratio — outdoor

    Maximum 3:1

    critical
  • Stabilisers / outriggers

    Fitted per the manual before the tower is climbed

    critical
  • Castors

    Locked while in use; never move the tower with a person or materials on it

    critical
  • Access

    Internal ladder only — never climb the outside frame

    critical
  • Manual on site

    Manufacturer instruction manual available at the tower

    standard

Next step

Turn this into evidence you can hand over

Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.

  • Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
  • Usable the same dayTemplates and registers are pre-filled with your company details.
  • Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.