Printable site checklists / MOHRE labour accommodation inspection Authority packs
MOHRE labour accommodation inspection Camp walk against Ministerial Resolution 44 of 2022: room occupancy and floor area, sanitation ratios, kitchens, potable water, fire safety and welfare records.
86 checkpoints · Monthly, plus before any authority visit · MOHRE, Civil Defence · Updated 8 September 2026
Saved on this device only — sign in to save progress to your accountSite / area Emirate Completed by
Rooms, space and sleeping Fire and emergency Fire detection and alarm system tested and certificated by an approved company UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Extinguishers of the right type at kitchens, corridors and electrical rooms, serviced within 12 months UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Two means of escape from each block; corridors and stairs clear and exit signs illuminated UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
No cooking, smoking or unauthorised electrical appliances inside sleeping rooms UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Evacuation drill carried out and recorded within the required interval UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Assembly point signed, lit, and a roll-call procedure held per block UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Welfare management and records Kitchen and food safety detail External areas, transport and access control Camp perimeter fenced, gate manned or access-controlled, with visitor sign-in MOHRE Ministerial Resolution No. 44 of 2022 (workers' accommodation standards) Action / comment: ______________________________________________
External walkways, car parks and roads lit at night and kept in good repair MOHRE Ministerial Resolution No. 44 of 2022 (workers' accommodation standards) Action / comment: ______________________________________________
Refuse collection point covered, pest-proofed and cleared on a fixed schedule MOHRE Ministerial Resolution No. 44 of 2022 (workers' accommodation standards) Action / comment: ______________________________________________
Bus parking and manoeuvring areas separated from pedestrian routes within the camp Federal Decree-Law No. 33 of 2021 and Cabinet Resolution No. 1 of 2022 Action / comment: ______________________________________________
Bicycle or motorbike parking, where used, does not obstruct fire access routes UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
External storage of gas cylinders, chemicals or waste kept away from accommodation blocks UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Camp address and coordinates verified as easy to find for emergency responders UAE Fire and Life Safety Code of Practice (2018), Chapter 12 – Construction & Demolition Action / comment: ______________________________________________
Health, hygiene and infection control Records, contracts and compliance Electrical and structural condition Camp management governance Off-site and satellite accommodation Aligned with the publications named above — not certified by any authority. Always check the current version of the authority publication for your Emirate and free zone.