High-risk activities
Temporary works, formwork and falsework
Verifies temporary works are designed, checked, loaded and struck under control.
97 checkpoints · Before each pour and weekly · Dubai Municipality, ADOSH-SF · Updated 8 September 2026
Saved on this device only — sign in to save progress to your account
0 of 97 complete0%
Design control
Erection and pour
Striking
Temporary works design assurance
Materials and equipment condition
Erection competence and supervision
Loading and pour control
Access and working at height on formwork
Inspection regime
Dismantling and post-strike control
Falsework foundations and ground preparation
Climbing and jump-form systems
Slab and table formwork specifics
Documentation and competence records
Interface with other trades
Excavation support and shoring as temporary works
Falsework for bridges, transfer structures and heavy loads
Change control and as-built verification
Design, checking and handover
Aligned with the publications named above — not certified by any authority. Always check the current version of the authority publication for your Emirate and free zone.
Next step
Turn this into evidence you can hand over
Replace scattered spreadsheets and WhatsApp threads with one HSE operations system built around UAE authority expectations.
- Built around UAE authoritiesADOSH-SF, Trakhees, DM, DCD, MOIAT and ISO 45001 structures.
- Usable the same dayTemplates and registers are pre-filled with your company details.
- Evidence, not just formsEvery record carries dates, signatures and an export you can hand over.